Friday, December 19, 2008

concrete counters sealed and waxed


















The Ticor under-mount sink with concrete counter illuminated by sunlight.


















Concrete Counters are sealed, waxed and ready for a dinner party.


















The integral charcoal color looks wicked nice. Now need some real, bold COLORS, with backsplash, American Clay finishes and more.


















Close up of the aggregate.


















View along sink counter.


















Corner shot of aggregate exposed.

Thursday, December 18, 2008

installing concrete counters


















Sanding and staining window sills. I found that sawhorse on the side of the road!


















Concrete counters are in, almost. Not yet sealed or waxed - they'll be a bit darker when that's done.


















Looking good. Still needs sealant and wax (will be darker).


















Under-mount sink cutout with faucet sitting in place.


















Bar concrete counter piece is resting in place... will be sealed and mounted soon!

Wednesday, December 10, 2008

bathroom is becoming a room


















Hey, don't judge the bucket! At least I've got some running water indoors. 5 gallon sludge bucket serves as drain for now...


















Old, old adobe plaster crack getting repaired and sealed with new shower tile.


















Shower tile is porcelain Metallica line from TAU in dark coppers, iron oxide and graphite glazed. Thrifty design resulted in 18x18 base row and 6x6 above.


















More tiling progress...




















Concrete (Concrete is a green material: contains local and recycled content and no VOCs) bathroom counter was set today! Thanks, Counter Intelligence NM for the great slab and copper sink and wall mount fixture!





















































But it's a few inches too high for my preferances...will adjust once copper sink is sealed in place



















Sunlit shot of the kitchen/dining area barnwood sided bar with stools.


















Apples

Tuesday, December 2, 2008

Tiling. And I have moved in to my very own construction site!


















A shot of the awesome gas range all set up in the kitchen!! Kitchen needs backsplash, counters, and more. Also Still no, sinks, shower. Lots of molding, trim, doors, plastering and grouting to do.... But it's livable... mas o menos....



















Tiling the kitchen with beautiful quartzite solid stone tiles.


















Hard at work on a cold Thanksgiving day: focused on cutting the quartzite tile :-)



















The powerful wet tile saw that I got to use.


















The tile all laid nice n' level and in near perfect lines.

















Transporting the refrigerator. I found a great deal on craigslist. I got all Energy Star appliances.



















Dishwasher is in.


















Never ending painting...


















Like I said...



















Mariessa doing some plumbing touch ups for the kickass wall-mounted designer faucet.


















Ender with my new rescued-dog (no name yet, SharPei and Yellow Lab x) in the new yard with fence.